Edit or remove entries before sending. Changes apply to this report.
Defects
Downtime
Final Shift Notes
No AI summary generated. Generate it first to include the AI read in this email.
Email Report
Send to one or more addresses, separated by commas.
Edit Shift Setup
Saving changes the shift boundaries for everyone at this plant and discards its cached shift summaries.
Add User
Confirm Readings
READ ONLY — PAST DATA
Scan the machine's valve/timing sheet (or use the last scan) to populate the valve list.
GlassIQ
Container Glass Intelligence
Version 5
DefectIQ
Container Glass Reference
44 Defects
All
Finish
Neck
Shoulder
Body
Base
Internal
Critical
Major
LogIQ
Shift Log
Log Defect
Log Downtime
Job Settings
Job History
Machine
—
Section
Cavity
Severity
Defect
Notes
This Shift
Downtime
Scope
Section
Machine
—
DT Start
DT End (blank = still down)
Duration
Reason
Daily Readings
Daily readings: not yet recorded
Job History
TimingIQ
Scan a timing sheet to begin
AI Powered
Select Machine Type
Emhart FlexIS
Single section scan
Guided section-by-section scan
Printed Sheet / Other
Full machine printed sheet - O-I, Bucher Emhart, any layout. Photo or PDF.
Emhart FlexIS — Scan Type
Individual Section
Scan one section, get instant results
Full Machine Walk
Guided scan of all sections, generates machine report
Select Section to Scan
Process
Mold Configuration
Take or choose a FlexIS screen photo
Select section above first
Machine
Process
Mold Configuration
Machine Walk Progress
Ready to scan Section 1
Point camera at FlexIS screen for this section
Process
Mold Configuration
Scan Page 1
Take a photo, choose an image from your library (JPG, PNG, HEIC), or pick a PDF printed from the timing system Zeroed timings (ON=OFF) are auto-excluded
Confirm Extracted Data
AI read · Not found — tap to fill in
Recent ScansTap to review
Review Recommended
Calculated Values
Sheet
ReportIQ
End of Shift Report
Defects Logged
0
Critical
0
Timing Scans
0
Downtime Events
0
Shift Notes
Add Shift Note
AI Shift Summary
Open the report to generate a shift summary.
Settings
Plant & Machine Config
Managing Plant
—
Plant Info
Plant Name
Supervisor Email
Shop & Job Setup
Add shops and set active jobs. All scans, defects and downtime logs are tied to the active job.
Loading shops...
ADD SHOP
SHOP NAME
SECTIONS
GOB TYPE
Shift Setup
Shift pattern and start time for this plant. GlassIQ uses this to group logs and reports by shift automatically.
Shift Setup
App
Version
GlassIQ v5.0
Set Active Job
JOB NUMBER *
MOLD NUMBER
CONTAINER NAME
GLASS COLOR
PROCESS
PICKUP MODE
TARGET WEIGHT
oz
ACTUAL WEIGHT
oz
TARGET SPEED (BPM)
ACTUAL SPEED (BPM)
CAVITIES (GOBS)
CAVITY RATE CALCULATED
TONS PER DAY CALCULATED
EXPECTED JOB CHANGE
RUNNING SECTIONS check = running · uncheck = pulled or flexed down